Extended node data (Report period) for check valves

A check valve is a fundamental device used in water systems. Having a detailed graph of its closing status, upstream vs. downstream pressure and other parameters will be super useful!. Thank you Tal
about 1 month ago in Water Distribution Products / HAMMER 0 Needs review

Improve Graph Default Interval Increments

Sometimes WaterGEMS seems to have the most peculiar default intervals on graphs on the y-axis. I regularly see intervals of 0.63, 1.25,12.5, and 62.50. All of these tend to obscure the values I actually care about. I would much rather see interval...
about 1 month ago in Water Distribution Products / WaterGEMS 0 Needs review

Report Period graphs for SAV + SRV

Hi Having a dedicated Report Period of discharge flow + volume and valve's opening degree graphs, will be very beneficial as I'm using SAVs quite often as a solution, and it's very popular in many territories. Thank you Tal
about 2 months ago in Water Distribution Products / HAMMER 0 Needs review

Options for changing the color of the line

Sometimes it is necessary to mark territory in the network when presenting simulation results to colleagues. Currently, the ability to draw is only assigned with black color and standard line thickness.
7 months ago in Water Distribution Products / WaterGEMS 0 Needs review

Max Velocity constraint variable according to pipe diameter

In Portugal, as in several countries for where we work, maximum flow velocity in each pipe depends on its diameter. So that, as happens in SewerGEMS, velocity design constraint should be defined for each diameter, and should be a property of each ...
about 2 months ago in Water Distribution Products / WaterGEMS 0 Needs review

Customer Meter Associated Element - Physical Alternative as Default, not Demand Alternative

Currently it is extremely tedious to change the Associated Element of a Customer Meter Model Element. An unfortunate design choice during Customer Meter implementation into WaterCAD was that within the WaterCAD Schema this Attribute was assigned t...
about 1 year ago in Water Distribution Products / WaterCAD 0 Future consideration

web-based model viewer

In our sector of the company just me had the software watergems, so it would be awesome if we had a web-based model viewer just to share the results of the models, like pressure zones or headlosses. It would be an huge step for us, we also could u...
over 1 year ago in Water Distribution Products / WaterCAD 0 Future consideration

Bentley HAMMER batch compute option to run scenarios concurrently rather than consecutively

Hi Bentley Team, HAMMER currently runs batch computed scenarios sequentially. For complex models with multiple scenarios this often results in computations running overnight or even over several days to complete a batch of several scenarios. If po...
almost 2 years ago in Water Distribution Products / HAMMER 3 Future consideration

Open on selection for controls table

Sometimes you need to look at the controls for several facilities at once (e.g., two different pump stations that serve the same zone), and don't want to open the full controls table. It would be convenient to have an option to "open on selection"...
7 months ago in Water Distribution Products / WaterCAD 0 Future consideration

Create Option to Allow Split Pipes to Get Assigned Next AutoID

Currently, if a pipe is split, say the pipe is P-10000, the new segments are P-10000(1) and P-10000(2). This gets really messy when a pipe is split multiple times. Add an option under Tools / Options to assign the split pipe label to the "Next" pi...