Options for changing the color of the line

Sometimes it is necessary to mark territory in the network when presenting simulation results to colleagues. Currently, the ability to draw is only assigned with black color and standard line thickness.
3 months ago in Water Distribution Products / WaterGEMS 0 Needs review

Add direct access single click tool for selecting all upstream and all downstream pipes.

I suggest adding separate single click direct access tool or button (Water CAD/Water GEM) to selecting upstream and downstream pipes. It has the potential to save time and improve modeller's efficiency. This selection can be done through Navigator...
5 months ago in Water Distribution Products / WaterGEMS 0 Needs review

adding Model name and # of nodes/pipes to usage report

In order to have better visibility on the work done and distribute the cost charging among different projects, it would be nice to have the below additional into to the e365 open flows product usage: Number of actual model nodes/pipes Model File N...
3 months ago in Water Distribution Products / WaterGEMS 0 Needs review

Create Option to Allow Split Pipes to Get Assigned Next AutoID

Currently, if a pipe is split, say the pipe is P-10000, the new segments are P-10000(1) and P-10000(2). This gets really messy when a pipe is split multiple times. Add an option under Tools / Options to assign the split pipe label to the "Next" pi...
over 1 year ago in Water Distribution Products / WaterGEMS 0 Future consideration

Customer Meter Demand & Pressure support for Scada Elements

Most of our large customers are measured using smart meters which are present in our Scada System. Please add support for Scada Elements to connect to customer meters directly (demand & pressure).
about 1 year ago in Water Distribution Products / WaterGEMS 2 Future consideration

PRV that can control pressure at a remote node

Some hydraulic modelling software allows users to specify a remote node which as the target for PRV pressure settings. For example a PRV at the entrance of a zone might modulate so that the pressure doesn't exceed 30m at the node in the zone with ...
4 months ago in Water Distribution Products / WaterGEMS 0 Needs review

Add a toggle to disable moving elements in stand-alone applications.

It is far too easy to move elements in stand-alone WaterGEMS, such that I frequently move things by accident (thank you for easy undo). It would be nice to have the option to disable moving elements since we're 1:1 integrated with GIS and I rarely...
11 months ago in Water Distribution Products / WaterGEMS 0 Future consideration

Possibility to set pressure settings by SCADA element in SCADA Connect simulator

Please add possibility to override pressure settings in pumps and VPS battery pumps by SCADA data in SCADA Connect Simulator
9 months ago in Water Distribution Products / WaterGEMS 0 Needs review

VSP Battery as a target element for SCADA element

Please add possibility to set target element of SCADA element for VSP Battery pumps. It could be useful not only for viewing data, but it could be useful for the SCADA Connect simulations if you add possiblity to overriding pressure settings by SC...
9 months ago in Water Distribution Products / WaterGEMS 0 Needs review

Criticality Results Demand Shortfall for individual Customer Elements and Demand Nodes

In summary, add a separate Individual Element Demand Shortfall (%) result to the Affected Customer Elements and Affected Nodes Criticality Results Tab. Include all Customer Elements and Affected Nodes that are below an Individual Element Demand Sh...