Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Ideas

Showing 94 of 197

Allow Calculation Times Start Time Based on Time > 24 hr

Summary: Enable defining a calculation start time based on a time from start (can be > 24 hrs, e.g., T = 82 hrs), instead of a clock time (has to be 00 hrs to 23 hrs) (see attached figure). Model Setup Information: Our model has 7-day (168 hrs)...
about 3 hours ago in Water Distribution Products / WaterGEMS 0 Needs review

Avoid Erroneous Fire Flow Results

Summary: There is an issue with the default hydraulic parameters when setting up a new calculation option, which can lead to erroneous fire flow results. The hydraulic parameter “Use Linear Interpolation for Multipoint Pumps?” should default to "T...
1 day ago in Water Distribution Products / WaterGEMS 0 Needs review

Global Element Symbology Heading with Global Legend

It would be helpful to have a global element symbology folder that allowed us to create a legend of Elements used in the model. You could also create a master table with nested Elements and/or Flex Table connection.
6 days ago in Water Distribution Products / WaterGEMS 0 Needs review

Add ESRI REST service for background images

Add ESRI rest point service as found in MicroStation to stream proprietary high-res imagery
23 days ago in Water Distribution Products / WaterGEMS 0 Needs review

Optimisation of the inlet and outlet head-loss ratio for hydropneumatic Tank

The selection of this head-loss ratio must result from a sensitivity analysis of the maximum piezometric level at the tank connection during the transient regime, as a function of the value of this coefficient.”
about 1 month ago in Water Distribution Products / HAMMER 0 Needs review

Allow SCADA Elements to Associate with Customer Meters

In our system we have hundreds of physical customer meters that report hourly pressure. I have these in the model as SCADA elements and they are very useful but... the SCADA elements can only be associated with a junction somewhere else, so the el...
about 1 month ago in Water Distribution Products / WaterGEMS 1 Needs review

Add the ability to rearrange the order of entries in Selection Sets, Flextables, Profiles, Queries, Scenarios and Alternatives

The functionality of rearranging entries individually is not present in: Selection Sets, FlexTables, Profiles, Queries, Scenarios (on the same level), Alternatives (on the same level) and probably a few that I'm missing. For some of these there is...
10 months ago in Water Distribution Products / WaterGEMS 0 Needs review

Add Save-As feature to WaterGems for ArcGIS Pro

Introduce a Save-As Functionality on WaterGEMS for ArcGIS Pro, to allow the users to create a copy of the model and maintain all customization (layers, symbology, labels) in the original aprx.
5 months ago in Water Distribution Products / WaterGEMS 1 Future consideration

Make Changes to Profile Line Settings Persist

When you create a profile, the default lines are thin and hard to see. If you make them thicker, it can look great. But you cannot save these changes as a default, AND (my favorite part) if you change the profile time step or play the profile the ...
6 months ago in Water Distribution Products / WaterGEMS 0 Future consideration

Option to lock down and only able to save files in ProjectWise

Lock down to only have the ability to save files in ProjectWise will give organizations better control of files being properly stored and available to other users
2 months ago in Water Distribution Products / HAMMER 0 Needs review